Test suites

Group a target's Tests and run them on a schedule.

A Test suite is a set of Tests for one target that runs together, on a schedule or on demand. Suites are how detections get re-tested continuously: a Test in a scheduled suite runs every time the suite fires, and its detection's posture stays current.

Find a target's suites under Test suites in the sidebar. Creating and editing suites needs the editor role or above.

Creating a Test suite

Select New Test suite and fill in:

FieldDescription
NameA label for the suite.
DescriptionOptional.
TargetThe target whose Tests the suite holds. It cannot be changed afterwards.
Schedule (cron)A standard 5-field cron expression, such as 0 2 * * * for 02:00 every day. Leave it empty for a suite that only runs manually.
TimezoneThe timezone the schedule is evaluated in.

The form previews the schedule in plain language and shows the next run time as you type.

How many suites can have a schedule, and how often a suite may fire, depend on your plan. A schedule that fires more often than the plan allows is rejected.

Enrolling detections also creates suites — see Detections & Tests.

Managing a suite

The suite's page shows its schedule, next and last run, its Tests, and its Run history.

  • Tests — add Tests to the suite, remove them, or reorder them. A Test can belong to more than one suite.
  • Edit — change the name, description, schedule, or timezone.
  • Pause / Resume — stop and restart scheduled runs without changing the schedule. This is the same switch as Enabled in the edit form.
  • Delete — the suite stops running. Its runs and history are kept.

The suite list shows each suite's status: Running for a suite with an active schedule, Manual for a suite with no schedule, and Off for a paused suite.

Running a suite on demand

From the target's home page, select New run → Fire a Test suite and choose the suite. This works for a paused suite too. To run a single Test, use Run now on the Test.

What happens when a suite runs

Each Test in the suite starts its own run. Run history lists every time the suite fired, whether the trigger was Scheduled or Manual, and the outcome of each Test.

A Test is skipped, not failed, when it cannot start. The usual reason is Previous run in flight: the Test's last run has not finished validating. Leave enough time between scheduled runs for the target's validation window to close.